Solo–Yogyakarta Toll Road
| Solo-Yogyakarta Toll Road | |
|---|---|
Prambanan Toll Gate in 2024 | |
| Route information | |
| Maintained by PT Jasa Marga Jogja Solo | |
| Length | 96.57 km (60.01 mi) |
| Major junctions | |
| East end | Colomadu Junction, Semarang–Solo Toll Road |
| West end | YIA Kulonprogo Junction |
| Location | |
| Country | Indonesia |
| Major cities | Boyolali Klaten Sleman Kulon Progo |
| Highway system | |
The Solo–Yogyakarta–YIA Kulonprogo toll road or Joglo toll road is a toll road under construction in Indonesia that connects Surakarta urban area in Central Java with Yogyakarta urban area in Special Region of Yogyakarta. The toll road is part of the Trans-Java Toll Road. Construction of this toll road has begun in 2020 from the direction of Solo. Despite its name, the toll road terminus will not located within Surakarta and Yogyakarta, but in nearby Boyolali Regency and Sleman Regency.
The toll road was built elevated along the Yogyakarta Northern Ring Road (except at the intersection of Jalan Nyi Tjondrolukito/Palagan Tentara Pelajar near Yogya Kembali Monument which will be made at-grade), then continues along the Mataram Canal until it reaches the interchange in the Maguwoharjo area. The toll road will continue to Yogyakarta International Airport (YIA) which stretches from the Sleman interchange for 30.77 km. It is expected that the toll road will facilitate access from YIA to Yogyakarta.